    Oil & gas2017

    Refinery substation monitoring and control

    Rafinerija nafte Brod — via Galeb Internacional

    Supply and installation of a monitoring and control system for transformer station TS4/2, confirmed complete by the main contractor.

    • TS4/2 substation
    Utility infrastructure2017–2018

    Five pumping stations on cellular telecontrol

    City of Bihać

    PLC software for the municipal wastewater plant, with a siphon and four pumping stations each reporting to a central controller over a private cellular network.

    • 5 remote stations
    • Cellular telecontrol
    Utility infrastructure

    Municipal water supply, end to end

    Doboj Jug municipality

    Design, complete electrical cabinets, control software and SCADA for the municipality's main water supply.

    • Main water supply
    Utility infrastructure

    Water supply for Komušina

    Komušina, Teslić municipality

    Design, complete electrical cabinets, control software and SCADA for the village water supply scheme.

    • Water supply
    Agriculture2018–2019

    Lighting and automation for a 10,000 m² nursery

    Vrapčići, Mostar

    Detailed electrical and automation design plus PLC and SCADA software for an artificially lit plant nursery.

    • 10,000 m²
    Sport & recreation

    Snowmaking control for a ski resort

    Čajuša ski resort, Kupres

    Automatic control of the booster pumps and a SCADA system for an artificial snowmaking plant.

    • Booster pump control
    Machine building2018

    A custom test rig for a German manufacturer

    Kärcher

    Electrical design, terminal plan and as-built documentation for the CB2020 test device, built around CANopen I/O modules and custom power electronics.

    • Custom test equipment
    • CANopen I/O
    Machine building2016–2026

    A machine designed, built and revised across three generations

    MHBA

    Mechanical and electrical design, control code and tooling for a foil mounting machine — carried through three successive builds.

    • 3 generations
    • 6,658 engineering files
    Energy2024–2025

    Ten solar plants onto the medium-voltage grid

    Ten plant owners, Fojnica

    Medium-voltage design and procurement across ten substations, with a full grid connection study for the Ragala area.

    • 10 substations
    • Grid connection study
    Energy2026

    A 150 kW plant into national dispatch

    SE Ošve 1 — Herceg

    RTU integration into the EPBiH dispatch system, with protection relay configuration and bifacial module arrays.

    • 150 kW
    • Siemens 7SR5 protection
    Wood processing2019–2021

    Control for a wood pellet production line

    DD Ei — Energetika

    Production line and dryer control, built on Schneider drives and EcoStruxure Machine Expert.

    • Pellet line
    • Dryer control

    Have a system that needs modernizing?

    Tell us what you are running and what it needs to do. We will tell you what is realistic.