Case study

    Eleven years inside a Coca-Cola plant

    Four SCADA systems, seven engagements and a decade of remote support at the Hadžići bottling plant — from the water source to the wastewater outfall.

    Client
    Coca-Cola HBC B-H d.o.o.
    Location
    Hadžići, Bosnia & Herzegovina
    Sector
    Beverage production
    Engagement
    2012 – 2023

    4

    SCADA systems delivered

    11

    Years of continuous support

    7

    Separate engagements

    2019

    Client recommendation issued

    The challenge

    A bottling plant is several plants at once

    Water arrives from a well and has to be treated before it can touch a product. Syrup is prepared in one part of the building and metered to mixers in another. Filling lines run to a schedule. Everything that leaves the site as wastewater has to meet a discharge standard. Each of these is a separate process, with its own instruments, its own failure modes and its own regulatory paperwork.

    They had also been built at different times. Instrumenting a plant like this is rarely a clean-sheet exercise — it means adding visibility to equipment that already runs, from more than one manufacturer, without stopping production to do it.

    What the plant needed was not a single system. It needed live values and archived history on the handful of parameters that determine product quality and compliance, in each of those areas, arriving in a form an operator could read at a glance and an engineer could interrogate later.

    The work

    Four systems, one plant

    Delivered between 2012 and 2019, each covering a different process area.

    1. 01

      Wastewater treatment

      Automatic control, supervision and visualisation of the treatment plant, with live and archived records of the key parameters that govern what may be discharged.

    2. 02

      Olimpija mineral water well B2

      Control and supervision of the source itself — the first point in the chain, and the one where a fault stops everything downstream.

    3. 03

      Syrup room

      Instantaneous and cumulative mass flow and brix, tracked from the syrup tanks through to the mixers on the production lines. Brix is the sugar concentration — it is the product, measured.

    4. 04

      Water treatment

      Supervision and visualisation of raw and treated water, with live and archived parameter history across the treatment stages.

    On each system

    Design · supply of the required hardware and software · PLC programming · development of the graphical applications · commissioning · testing

    The relationship

    What kept it going after the systems were built

    A SCADA system is not finished when it is commissioned. Plants change, equipment is replaced, and software outlives the hardware it was written for.

    1. 2012 – 2019

      The four systems

      Wastewater, the Olimpija well, the syrup room and water treatment — designed, built, commissioned and handed over.

    2. May 2022

      WinCC to a Siemens S7-315C

      Reconfiguring the SCADA system to talk to a Siemens SIMATIC S7-315C controller, including the MPI link between the computer and the PLC.

    3. November 2022

      The Olimpija well back in service

      Equipment supply and the work needed to return the well's automatic control system to full working order.

    4. November 2023

      The CIP plant, and process values out to file

      SCADA parameterisation for monitoring the clean-in-place plant, with Profibus and TCP/IP communications established and drivers installed. Alongside it, software to pull live process values and write them to a file for downstream use — tested and signed off on site.

    All projects were realised successfully and on time, and over the years of operation have shown a high degree of technical reliability. I would particularly highlight the high-quality and expeditious remote service support — remote diagnostics of system operation, fault clearing, extension and improvement of the systems.

    Maintenance Supervisor

    Coca-Cola HBC B-H d.o.o. Sarajevo

    Letter of recommendation, 8 August 2019

    Why it lasted

    Most faults never needed a site visit

    The part of this the client chose to single out was not the engineering. It was the support model. A bottling plant runs to a schedule, and a control fault at three in the morning is measured in lost product, not in engineering hours — and the plant is a long drive from our workshop in Tešanj.

    Remote diagnostics closes that gap. Faults are identified and, in most cases, cleared without anyone travelling — and the same connection that clears a fault is the one used to extend a system rather than replace it. That is why systems commissioned in 2012 were still being improved in 2023.

    The last of those jobs is also the clearest ancestor of what Comex builds today: pulling live process values out of a plant and writing them somewhere they can be used. The Comex Control platform solves that same problem across a fleet of sites.

    At a glance

    Project specification

    Client
    Coca-Cola HBC B-H d.o.o.
    Site
    Hadžići, Bosnia & Herzegovina
    Sector
    Beverage production
    Process areas
    Wastewater treatment · Olimpija mineral water well B2 · Syrup room · Water treatment · Clean-in-place
    SCADA platform
    Siemens WinCC
    Controllers
    Siemens SIMATIC S7-315C
    Communications
    Profibus · MPI · Ethernet TCP/IP
    Scope
    Design, hardware and software supply, PLC programming, graphical applications, commissioning, testing
    Support model
    Remote diagnostics and fault clearing
    Engagement
    2012 – 2023
    • Wastewater treatment
    • Olimpija mineral water well B2
    • Syrup room
    • Water treatment

    Running a plant that grew one system at a time?

    Most of our longest relationships started with a single process area. Tell us which one is causing you the most trouble.